NDT AND INDUSTRIAL INSPECTION

Penetrant testing of pipe welds

For a piping contractor, prefabrication workshop or maintenance team, penetrant testing needs to fit the work sequence. WELLDIUM INSPECTION CND reviews weld quantities, preparation and the applicable specification to define a surface examination and reporting scope suited to your acceptance requirements.

Stock illustration — industrial environment.
Stock illustration — industrial environment.

Identify the welds and the inspection stage

Requests may concern workshop welds, site connections or areas repaired after an initial examination. An isometric drawing or identified weld list removes uncertainty about which assemblies are included.

State the planned sequence: welding completion, any treatment, examination, coating or insulation. The appropriate inspection stage and any waiting period imposed by the specification must be checked in the dossier; they are not automatically set by the request form.

  • Identify butt welds, branches and other joints included in the scope.
  • Provide quantities, diameters and access conditions.
  • Identify repairs and examinations already completed.

Prepare a surface suitable for PT

PT addresses discontinuities open to the examined surface. Material grade, preparation and product compatibility must therefore be known. Cleanliness requirements are particularly useful for process piping.

Access around the weld circumference must be reviewed. A section obscured by a support, wall or adjacent pipe may restrict coverage. Preparation activities are agreed before the visit.

  • Describe surface condition, paint and other protective layers.
  • Specify expected temperature and restrictions on test products.
  • Provide access photographs for congested areas.

Assess indications against the correct criteria

A useful result links each indication to a weld and agreed criteria. The presence of an indication alone does not automatically establish acceptance or rejection.

ISO 3452-1:2021 addresses the method. ISO 23277:2015 may provide acceptance levels for metallic welds within its scope. The contract, construction code or client specification determines the required reference and level.

  • Confirm the required edition and level.
  • Distinguish testing requirements from acceptance criteria.
  • Define how indications and repairs will be documented.

Link the report to your fabrication records

Deliverables may include examined weld identification, test conditions, recorded indications and conclusions within the specified scope. Sketches and authorized photographs are agreed against documentation requirements.

For repaired welds, maintaining the link between the initial examination, repaired area and re-examination provides traceability. PT does not replace an internal examination where one is required.

  • Clear correspondence with weld references.
  • Untested portions and any restrictions encountered.
  • Results of examination after repair where included in the order.

Methods to consider for your specification

PT

For surface-breaking discontinuities in compatible materials and surfaces.

The examination addresses the accessible surface and does not characterize all internal discontinuities.

VT

For visible weld characteristics within the agreed scope.

Access and viewing conditions must support the examination; a PT service does not automatically include a separate VT examination.

Information needed for your quotation

  • Isometric drawing or weld list with identification.
  • Grade, diameters, joint quantities and joint configuration.
  • Preparation status, temperature and circumferential access.
  • Required specification, edition, criteria and acceptance level.
  • Workshop or site location, work sequence and requested window.
  • Cleanliness, reporting and any post-repair examination requirements.

Explore the methods

LET’S DISCUSS YOUR PROJECT

Your next inspection starts here.

An equipment item. A location. A deadline. Tell us what you need.

Request a quote